From January to March 2019, three PhDcandidates and a visiting scholar started at TU Delft on SFT-related research. ByMarch 2019, the core team of SFT TU Delft team has been set up (Figure 1),which include the following new members: 

2019年1月至3月,三名博士研究生和一名访问学者开始在代尔夫特理工大学开展悬浮隧道相关研究。到2019年3月,代尔夫特理工大学悬浮隧道的核心团队已经成立(图1),其中包括以下新成员:

- Marcel‘t Hart, part-time PhD Candidate on SFT Risk Assessment,Senior Engineer TEC (started January 2019)

 - Marcel don Hart,SFT风险评估兼职博士研究生,高级工程师TEC(20191月开始)

- Gina Torres, full-time PhD Candidate onSFT Risk Assessment (started February 2019)

-    ginaTorres, SFT风险评估专业全职博士研究生(20192月开始)

- Pengxu Zou, full-time PhD Candidate onSFT Hydrodynamics (started March 2019)

-   邹鹏旭,SFT流体动力学专业全职博士研究生(20193月开始)

- Lingfeng Liu, full-time VisitingScholar on SFT Structure & Design (started March 2019)

-刘凌峰,SFT结构与设计专任访问学者(20193月开始)

Figure 1: SFT Core Team at TU Delft  - March 2019 (Figure by Ni Yan)

图1:代尔夫特理工大学SFT核心团队- 2019年3月(严妮图)

On Thursday 28March 2019, the SFT TU Delft kick-off meeting took place at the Faculty ofCivil Engineering and Geosciences (Figure 2). The kick-off took form of atypical Dutch lunch meeting with sandwiches. All members of the TU Delft SFTcore team attended the meeting.

2019328日星期四,代尔夫特理工大学土木工程与地球科学学院举行了SFT 启动会议(2)代尔夫特理工大学SFT核心团队全体成员出席了会议。

Dr. Dirk JanPeters, the scientific coordinator of the SFT project at TU Delft, summarisedthe project progress and current status. All four new team members introducedthemselves and their respective research topics. The meeting provided a goodopportunity for the TU Delft team members to interact, fostered interdisciplinarydiscussions among different work packages, and brought all team members to thesame page regarding the development and planning of the project.

代尔夫特理工大学SFT研究项目的科学协调员Dirk Jan Peters博士总结了该项目的进展和现状。四位新成员都介绍了自己和各自的研究课题。会议为代尔夫特理工大学的团队成员提供了一个良好的互动机会,促进了各研究工作之间的跨学科讨论,并使所有团队成员就项目的发展和规划达成共识。

Figure 2: TU Delft SFT Core Team Kick-off LunchMeeting on 28 March 2019 (Photo by Ni Yan)

图2:代尔夫特理工大学SFT核心团队2019年3月28日启动午餐会(严妮摄)

Completedand Ongoing MSc and BSc work

已完成和正在进行的本科生和硕士研究生工作

Since 2018, MSc and BSc students have worked/ being working on various (sub)subjects of the SFT research for their finalgraduation projects at TU Delft, including:

2018年以来,本科生硕士研究生为他们在代尔夫特理工大学的毕业论文,对SFT研究的各种()课题进行研究,其中包括:

- MSc thesis on SFT completed in2018-2019:

TU Delft MSc theses can be downloaded at https://repository.tudelft.nl/

o  ChrisHeuberger, MSc thesis work completed on 5 June 2018, Floating bridge – responsemodel of pontoon supported structure in frequency domain

o  LisanneDrost, MSc thesis work completed on 17 January 2019, Comparison of wave andcurrent model test results with Morison equation, including parametercalibration

o  LauraBakker, MSc thesis work completed on 7 March 2019, Design criteria for flexibleshore connection

-   2018-2019年完成的硕士研究生悬浮隧道论文:

TU Delft硕士研究生论文可以在这个网址https://repository.tudelft.nl/下载

o  ChrisHeuberger, 2018年6月5日完成硕士研究生论文,主题是悬浮隧道-浮筒固定结构的频域响应模型

o   LisanneDrost, 2019年1月17日完成硕士研究生论文,主题是波浪和水流模型试验结果与莫里森方程的比较,包括试验参数率定

o   LauraBakker, 2019年3月7日完成硕士研究生论文,主题是柔性接岸连接的设计标准

- Other MSc & BSc work on SFTcompleted in 2018:

o  COMEMMSc group, Risk inventory completed

o  BScstudent group, Wave and current scale model tests completed

-      2018年其它本科生和硕士研究生完成的工作:

o  欧盟多学科硕士研究生项目,完成了风险清单

o  本科生组,完成了波浪与水流比尺模型试验

-  Ongoing MSc work on SFT in 2019:

o  Davidede Zara, Dynamic model of SFT with moving train/traffic loads (with Prof. A. Metrikine)

o  WeiyiZhang, Dynamic longitudinal model of SFT to be used of prediction of effect ofirregular and oblique wave loads (with Prof. A. Metrikine)

Mart-Jan Hemel, Evaluation of wave and currentmodel tests with numerical 2D model

-  2019年正在进行的硕士研究生工作:

o  Davidede Zara, 移动的列车/交通荷载工况下的悬浮隧道动力模型,指导教授Prof. A. Metrikine 

o  张惟一,用于预测不规则波和斜向波浪荷载影响的悬浮隧道纵向动力模型,指导教授Prof. A. Metrikine

o  Mart-JanHemel,采用二维数值模型评估波浪和水流模型试验

Figure 3: Laura Bakker MSc project presentationon SFT end joint design on 7 March 2019 (photo by Ni Yan)
图3:Laura Bakker悬浮隧道端部接头设计报告,2019年3月7日(严妮摄)

Planningand Outlook

项目规划和前景

Focus for TU Delft in 2019 includesexperiments in China on longitudinal model and deep flume model. Additional BScprojects with experiments in the TU Delft Water Lab is planned for May/June2019. Furthermore, numerical work and risk modelling work shall be started.

2019年代尔夫特理工大学的研究重点包括在中国开展的纵向模型和深水槽模型试验。计划20195/ 6月在代尔夫特理工大学水力学实验室开展新增的本科生研究试验工作。此外,还将开展数值建模工作和风险建模工作。

We look forward to a productive year on SFTresearch with joint effort from the consortium members!

我们期待在悬浮隧道工程技术联合研究组成员的共同努力下,SFT研究将取得丰硕成果!

责任编辑:editor

上一条: 拟建连接阿联酋与印度的海底轨道通道Subsea Rail Link between UAE and India Proposed

下一条: 交通运输部副部长刘小明参观天津悬浮隧道水池试验室


中国交建 TEC TU 天科院 大连理工大学

Copyright © 2019 中交悬浮隧道工程技术联合研究组_CCCC_SFTJT版权所有 |粤ICP备05060342号-7· 设为首页 · 加入收藏 · 管理系统SFT · 管理系统(内网)